|
|
Project:
Statewide Gas Pipe Replacement Project
|
Location: Minnesota Description: Q3 Contracting provided turnkey services as part of pipe replacement project. (2005-2008)
- 3 year replacement project mandated by OPS
- 100 miles main and 2500 services
- Locate and verify faulty brand of pipe
- Zero accidents and injuries
- 95% unit based pricing |
VIEW PROJECT IMAGESHave a Similar Project Need?
|
Project:
Pipeline Extension
|
Location: Woodbury, Minnesota Description: As part of county road project Q3 Contracting installed new steel gas main (2008).
- 10,200 feet of 20” steel
- 3 tie ins
- 900’ bore
- install one 3 valve header
- hydrostatic test
- remove old main
- Zero injuries
|
VIEW PROJECT IMAGESHave a Similar Project Need?
|
Project:
Pipeline Re-Vegetation
|
Location: Central and Southern Wisconsin Description: Q3 Contracting crews performed re-vegetation in right away for oil pipeline that ran through agriculture and woodland regions of state. (2007-2008)
Description:
- 1500 acres over 100 miles
- Soil de-compaction
- Rock picking
- Drill seed and mulch
- Hydro seeding (tackifier)
- Fence repairs
- Organic and wetland
- One small recordable injury
|
VIEW PROJECT IMAGESHave a Similar Project Need?
|
Project:
Mobile Traffic Operation
|
Location: Minneapolis / St. Paul, Minnesota Description: Traffic services division provides protection for customer performing non destructive testing of light poles on metro freeway system.
- 12,000 light poles
- 18 month project
- Two trucks with mounted crash attenuators
- Two truck mounted arrow boards
- One trailer mounted arrow board
- One changeable message board
- Shift work 9am through 4:30am
|
VIEW PROJECT IMAGESHave a Similar Project Need?
|
|